Birmingham Westside Metro Extension
The tram network lies at the heart of the region’s exciting public transport integration plans.
The tram network lies at the heart of the region’s exciting public transport integration plans.
VVB was involved in the M&E systems for the cable replacement works in an existing National Grid tunnel.
VVB was employed as the M&E sub-contractor to design and build new infrastructure to replace degraded assets.
VVB was responsible for major electrical power installations and refurbishment of the 40-year-old infrastructure.
VVB oversaw design, installation and commissioning of M&E and control systems, coordinating with consultants, the end user, specialist suppliers, subcontractors and civils.
VVB project managed the vent system’s M&E requirements, from RIBA Stage D design, to installation, commissioning and handover.
VVB project managed the M&E requirements of a 250m twin bore, dual carriageway tunnel.
VVB was awarded a three-year contract to look after the design, supply, installation and maintenance of M&E equipment and infrastructure.
VVB provided management, engineering, supervision and skilled labour for Crossrail, including site set-up.
VVB was appointed on a target cost basis to manage delivery of the M&E elements from inception, through installation and commissioning, to completion.