Birmingham Westside Metro Extension

The tram network lies at the heart of the region’s exciting public transport integration plans.

Beddington to Rowdown

VVB was involved in the M&E systems for the cable replacement works in an existing National Grid tunnel.

Fore Street Tunnel Refurbishment

VVB was employed as the M&E sub-contractor to design and build new infrastructure to replace degraded assets.

St Chad’s and Queensway Tunnels, Birmingham

VVB was responsible for major electrical power installations and refurbishment of the 40-year-old infrastructure.

Severnside Energy Recovery Centre

VVB oversaw design, installation and commissioning of M&E and control systems, coordinating with consultants, the end user, specialist suppliers, subcontractors and civils.

Moreton Terrace Mid Tunnel Vent Shaft Upgrade

VVB project managed the vent system’s M&E requirements, from RIBA Stage D design, to installation, commissioning and handover.

A505, Hertfordshire Baldock Bypass Tunnel Construction

VVB project managed the M&E requirements of a 250m twin bore, dual carriageway tunnel.

Queens Gate Tunnel, Cardiff

VVB was awarded a three-year contract to look after the design, supply, installation and maintenance of M&E equipment and infrastructure.

Crossrail C335 and C360

VVB provided management, engineering, supervision and skilled labour for Crossrail, including site set-up.

Ramsgate Harbour Approach

VVB was appointed on a target cost basis to manage delivery of the M&E elements from inception, through installation and commissioning, to completion.