Bell Common

VVB assisted in design and supplier selection, as well as the 550m tunnel’s M&E and communications systems.

Thames Tideway

VVB’s scope included temporary tunnel systems, temporary electrical systems, tunnel monitoring and communications.

Channel Tunnel Rail Link (Contract 240)

VVB project managed the electrical requirements, including installation and maintenance of both Wirth Tunnel Boring Machines.

Riverside Resource Recovery Facility

VVB’s involvement on-site started before the building’s foundation was laid, allowing us to input into construction at every stage, delivering a well-coordinated install.

C530 Crossrail: Woolwich Station

VVB provided the M&E works, and managed significant interfaces with other supply contractors throughout.

National Grid Power Tunnels (LPT1)

VVB provided technical knowledge and experience to all elements of the M&E systems, achieving programme savings.