Business Sectors
Rail
Name:
Works:
Battersea Park Train Station Redevelopment
Contract Value £4.9m Battersea Park station redevelopment involves the complete refurbishment of the existing Victorian Station Buildings and Platforms. Battersea Park Station is located between Clapham Junction and London Victoria, and serves trains on the South London, Atlantic and Brighton …
Name:
Works:
Tottenham Court Road Tube Station Redevelopment
VVB were appointed by London Bridge Associates/Mace to produce a construction methodology report and provide design input to the proposed temporary and permanent M&E services. Our role included: Liaison with consultants, LUL, Tubelines, Utility Companies, Civils and Specialist Subcontractors Involvement …
Name:
Works:
Cooling the Tube Programme Mid Tunnel Vent Shaft Upgrade Somerleyton Road
Contract Value £1m The Somerleyton Road vent shaft upgrade is part of the Cooling the Tube Programme upgrade of the entire mid tunnel ventilation shafts on London Underground Victoria Line. The project involved the removal of the existing ventilation system …
Name:
Works:
Cooling the Tube Programme Mid Tunnel Vent Shaft Upgrade Moreton Terrace
Contract Value £1m The Moreton Terrace vent shaft upgrade is part of the Cooling the Tube Programme upgrade of the entire mid tunnel ventilation shafts on London Underground Victoria Line. The project involved the removal of the existing ventilation system …
Name:
Works:
Conveyor System - Channel Tunnel Rail Link
VVB Engineering Services Ltd were appointed as the mechanical and electrical engineering contractor for Costain Skanska Bachy JV on The Channel Tunnel Rail Link in 2001. Part of the brief was to: Prepare a design specification Appoint a designer and …
Name:
Works:
Electrical services providing installation, operation, expansion & maintenance of tunnel conveyor system servicing 2 TBM’s advancing up to 33 metres per 12 hr period.
Name:
Works:
Electrical services providing installation, operation & maintenance of conveyor system. The surface conveyor system comprised of 5 conveyors totalling approx 400 metres long, all of 1600 tons/hour capacity and 1000mm wide conveyor belt.
Name:
Works:
Value £450,000 Electrical engineering support, electrical installation and maintenance for tunnel refurbishment and lining.