A new covered temporary passenger walkway was constructed by Costain to allow a passenger route from Arrivals to the terminal while demolition and construction works were carried out to the North Terminal extension.
VVB were appointed by Costain to project manage the M&E requirements of the contract from design to commissioning and handover of the finished project.
Our role included:
- Controls and Electrical Design
- M&E Design Coordination and Integration
- Installation and Maintenance of Temporary Site Services
- M&E Installation
- M&E Testing and Commissioning
- Co-ordination with the airport system maintainers
Throughout the design and preconstruction phase VVB provided technical knowledge and experience to all elements of the M&E systems and liaised with Costain to produce a complete integrated solution.
Our scope included:
- New electrical supplies
- LV distribution and containment
- New lighting, emergency lighting and small power installation
- Fire alarm system
- Door access and telephone installation
- CCTV installation
- New electric heating installation